Fire Stopping

Fire rated products fitted around services, imperfections in construction and linear seals.

Fire Partitions

Fire rated ceilings & partitions constructed inline with British Gypsum White Book Specifications.

Fire Doors

Fire doorset installation & maintenance undertaken to Q-Mark certification standards.

Fire Consumer Unit

Fire rated electrical consumer unit covers fitted  for HMO properties to comply with IAT regulations.

VIEW ALL SERVICES

The Haven, Purfleet

Date

January 2022 – February 2022

Remedials

All Risers across 33 Blocks

Client

Residents

Evolutions were able to completely overhaul the fire compartmentation and protection within service risers inside 33 blocks of flats at The Haven, Purfleet.

Evolutions were instructed to undertake the required remedials to the risers, reinstating construction & installing firestopping to modern fire resistant standards.

All risers were undertaken swiftly to BMTRADA certified standards without disturbing the residents daily lives.

Works consisted of;

– Firestopping to Electrical & Water Services on each floor

– Firestopping between floors

– Reconstruction of any incomplete partitions to suitable fire resistant standards

– Firestopping behind fire door frames to a proven specification

How we Completed

Working closely with the managing body, Evolutions devised a phased, floor by floor approach to each block. Ensuring all areas where completed before moving onto the next floor. By doing it in this method Evolutions removed wasted trips and consolidated noise and disturbance to a select time window.

The Goal

To rectify all areas of ineffective compartmentation. In doing so would allow the building to operate as per its fire strategy and provide the nessecary time to escape & for fire services to operate.

Final Results

Thousand of penetrations, linear joints were sealed using certified solutions to ensure the compartmentation within has been restored to a high standard.

Check out some of our Seals

A collection of some of our fire seals taken from within various blocks onsite. Evolutions conducted tested and certified solutions to address the issues with construction.