Date
January 2022 – February 2022
Remedials
All Risers across 33 Blocks
Client
Residents
Evolutions were able to completely overhaul the fire compartmentation and protection within service risers inside 33 blocks of flats at The Haven, Purfleet.
Evolutions were instructed to undertake the required remedials to the risers, reinstating construction & installing firestopping to modern fire resistant standards.
All risers were undertaken swiftly to BMTRADA certified standards without disturbing the residents daily lives.
Works consisted of;
– Firestopping to Electrical & Water Services on each floor
– Firestopping between floors
– Reconstruction of any incomplete partitions to suitable fire resistant standards
– Firestopping behind fire door frames to a proven specification
How we Completed
Working closely with the managing body, Evolutions devised a phased, floor by floor approach to each block. Ensuring all areas where completed before moving onto the next floor. By doing it in this method Evolutions removed wasted trips and consolidated noise and disturbance to a select time window.
The Goal
To rectify all areas of ineffective compartmentation. In doing so would allow the building to operate as per its fire strategy and provide the nessecary time to escape & for fire services to operate.
Final Results
Thousand of penetrations, linear joints were sealed using certified solutions to ensure the compartmentation within has been restored to a high standard.